TURBINE PLATFORM / GE
GE
Search the complete controlled reference index. Final compatibility must be qualified against serial number, package BOM and installed configuration.
Applications: Frame 1, 2, 3, 5, 6/6B, 6F, 7E/7EA, 7F, 9E/9EA, 9F, 7HA/9HA, LM1600, LM2500, LM5000, LM6000, LMS100, TM2500
| Component | Description | Manufacturer | Manufacturer P/N | Gas Turbine OEM P/N | PMA P/N | Status |
|---|---|---|---|---|---|---|
| Loading controlled references… | ||||||